One morning at the beginning of the summer of 2019, the company received an electric mop project. The project time was very short and tight. The customer said that he would see the plan soon. After knowing it, we stopped the power tool design in our hand and transferred three designers, including me, to design at the same time. The design process started from 9: 30 this morning to finish the first plan at 5: 00 a.m. the next day. after the review, the second plan started to be designed at 9: 00 a.m. the next day (hand-painted was finished very early) and finally finished at 5: 00 p.m. the next day. It was also the first overnight in my design career.
First Draft of Simple Electric Mop Design
The black dot on the side is the power switch, and the big black button on the front is the removal button of the mop cloth (maybe it has been forgotten now, it was clearer at that time)
The mop bar is detachable and can be squatted or standing. (This idea is not what we think is already in the market)
Added movable grip lever
Side view
Top view
Second Draft of Simple Electric Mop Design
Sports butterfly modeling focuses on sports feeling
Apply the first draft grip lever
This time I went to work for two consecutive days and one night for 30 hours, but the result was quite good and the design was completed. The customer also paid the bill (a total of 4 design plans were submitted). After the design was completed, the company forced me to take a day off. After a few days, Cary received overtime pay from 800 yuan.
The copyright of this work belongs to 太空大菠萝. No use is allowed without explicit permission from owner.
New user?Create an account
Log In Reset your password.Account existed?Log In
Read and agree to the User Agreement Terms of Use.
Please enter your email to reset your password
666
I love the last color scheme
The first night in life seems to have been spent playing games or watching TV..
Is there anything without overtime pay..
And overtime pay. Gee