Nanmu Design Works Modular Power Platform Inspection Cabinet
After market research, it is found that the existing relay protection test platform is large in size, which is not convenient for secondary maintenance personnel to carry to the substation; the space in front of the protection screen is limited, and after the relay protection tester and other tools are placed, the activity space for secondary maintenance personnel is relatively small, which affects the movement of staff, and the manual handling of the test device greatly reduces the work efficiency.
Nanmu Design has worked hand in hand with the State Grid to design and develop a relay protection maintenance test platform to solve the above problems. The overall modular box design is adopted to facilitate the selective access of different modules under various conditions. It is a way of splicing the wire box and the toolbox left and right, and the bayonet is connected to facilitate the separate rescue operation of maintenance personnel under special circumstances.
At the same time, it can store various testers produced by different manufacturers, and the size is small and easy to handle compared with the existing products. The platform conforms to ergonomics, relieves the work fatigue of inspectors, improves work efficiency and is convenient for on-site use.
The copyright of this work belongs to 南木设计. No use is allowed without explicit permission from owner.
New user?Create an account
Log In Reset your password.Account existed?Log In
Read and agree to the User Agreement Terms of Use.
Please enter your email to reset your password
Big Brother
This detail is really love
Great
I gave 100 points for this design.
Major