China Meteorological Administration | Urban waterlogging disaster monitoring system
Intelligent Hardware Product Design Specialist
Service content: industrial design, product design, appearance design, structural design
A city street lamp waterlogging intelligent monitoring system, the use of industrial design to solve the existing technology monitoring equipment power supply difficulties, structural design installation location complex, equipment anti-damage ability is poor, can not be timely and accurate waterlogging monitoring problems. Urban waterlogging disaster is due to short-term heavy rainfall or process rainfall caused by excessive runoff, in the low-lying, poor drainage and other conditions and the formation of water accumulation of urban natural disasters. In the period of rapid economic development, the impact of human activities on urban waterlogging is becoming more and more significant. First, urbanization changes the topography/geomorphology of the city, which in turn affects the catchment conditions. With the expansion of urban areas, housing construction is more intensive, the impervious area of concrete pavement is increasing, while the surface vegetation and pits are decreasing, resulting in the surface water holding, stagnant water and infiltration capacity weakened. During rainstorm, the time of production and confluence is shortened, the surface and river runoff increases sharply, and the waterlogging disaster is aggravated. At the same time, three-dimensional development of urban space. Such as the basement, underground parking lot, subway, road under-dug interchange channel, such as a large number of construction, once the water accumulation, the loss is also huge. At present, there is no special real-time monitoring system for waterlogging in cities. When rainstorms occur, they often cannot give timely and accurate waterlogging conditions, and it is difficult to take reasonable countermeasures. In addition, the current waterlogging monitoring is mainly through the monitoring points distributed throughout the city to achieve water level monitoring, the main key technical difficulties lie in the monitoring equipment power supply difficulties, installation location is complex, equipment damage prevention ability is poor.
The copyright of this work belongs to 博思纵横咨询设计. No use is allowed without explicit permission from owner.
New user?Create an account
Log In Reset your password.Account existed?Log In
Read and agree to the User Agreement Terms of Use.
Please enter your email to reset your password
Thanks for sharing
Professional
Wow, this is so powerful
666
very good